Blogger Template by Blogcrowds

The Basement (Parts 175-184)

Sunday, June 01, 2008
Yes, 6 months later, we're finally almost done with the basement. We've been a little busy...

We installed the 5 cabinet doors we were waiting on, 4 on the corner cabinets at the bottom of the stairs and 1 over the electrical box (175-179) and assembled the shower (180). Assembling the shower, by the way, was about 63 steps all by itself, and took 4 people with at least 7 or 8 degrees.

In case I never blog about it, the final parts that are left: putting up a towel rack (181), finishing the bottom edge of the back door (182), hang up pictures (183), and bring home the baby (184). That is, after all, why we started this project... :-)

0 comments:

Post a Comment