Part 19: The electric rough-in is done! All of the wires are in the boxes and stripped. We're ready for the inspector, who is coming Monday morning.
Parts 20, 21, 22, and 23: All of the phone lines, cable lines, speaker wires, and ethernet lines are run. Wires are in the boxes, taped and stapled where needed. Here's hoping that when they drywall is up, we'll be able to figure out which wire is which...
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment